Owning Palette: Execution Control Express VIs and Structures
Requires: Base Development System
Inserts a time delay into the calling VI.
| Dialog Box Options |
| Block Diagram Inputs |
| Block Diagram Outputs |
Add to the block diagram |
Find on the palette |
| Parameter | Description |
|---|---|
| Time delay (seconds) | Specifies how many seconds to delay running the calling VI. The default is 1.000. |
| Parameter | Description |
|---|---|
| Delay Time (s) | Specifies how many seconds to wait. The value you wire to this input overrides the value you set in the configuration dialog box. |
| error in | Describes error conditions that occur before this node runs. |
| Parameter | Description |
|---|---|
| error out | Contains error information. This output provides standard error out functionality. |
This Express VI operates similarly to the following VIs and functions: